Skip to content

E01 · F08 · CHK-005 — Checkpoint in the middle of F08 ​

Pause between moving points and adding or deleting them: bring documentation and methods up to date as the project grows, before going on (ADR-0028, /run skill).

Acceptance criteria ​

  • Given the stories merged since the spike, when the checkpoint runs, then docs/domain/, derivations, references, conventions, CLAUDE.md and .claude/rules/ describe the code as it is.
  • Given the light evolvability check, when it runs, then each of its six questions has a one-line answer and anything worth acting on is in the improvement log.
  • Given the user stories merged so far, when the checkpoint ends, then their Product Owner test cards are listed for the next stop.

Tasks ​

One task = one commit, referenced as CHK-005.Tn.

Light evolvability check (2026-10-11) ​

QuestionAnswer
Size86 modules in src/ (model 38, geometry 27, math 11, io 6, render 4); 45 playground modules; 448 tests; the subfolders of model stay for the E01 retrospective (improvement log)
ToolsStrykerJS still blocked; mutations by hand (five on US-014, all caught); --cooldown for version checks waits for the review of versions at the end of E01
Fitness functionsa stored playground value is checked again on reading (isValidFreeShape): a refused value never reaches the drawing
Patternstwo playground copies merged (readShapeKind, writeInputValue); the playground state spread over DOM attributes asks for a state module (improvement log)
Agent configurationthe auditor found two crashes the tests missed: every playground story now tests a refused shape with each new control
Processthe run goes on as planned: US-015 (midpoint), US-016 (delete), AUD-005, VAL-005

Test cards for the next stop ​

  • US-014 — convert a polygon, move a point by its x, y.