ADR-0017 — Agile backlog kept in the repository ​

Status: Accepted

Context ​

The Product Owner asked to split the project into epics, features, user stories and tasks, with a rigorous method but without Jira or Azure DevOps: everything stays in the repository. Everything is written first, then implemented.

Decision ​

  • Method: the four-level hierarchy Epic → Feature → Story → Task of the user's methodological note (SAFe levels on top of Scrum, as in Azure Boards' Agile process), with Scrum's rules (REF-SCRUM-GUIDE), SAFe story types (REF-SAFE-STORY), INVEST and vertical slices (REF-HUMANIZING-SPLITTING), Given / When / Then acceptance criteria.
  • Storage: one Markdown file per epic, feature and story in docs/backlog/, with a flat front-matter block; tasks are a checklist inside their story. The backlog is part of the documentation site.
  • Integrity: backlog.test.ts checks IDs, statuses and parent links — the checks a Scrum Master would run in Jira (orphan stories) are automatic.
  • No iterations: the project is run at home, without sprints; items flow through their statuses, one story in progress at a time. Scrum's events reduce to refinement and acceptance.
  • Traceability: commits cite backlog items in footers (Refs:, Closes:).
  • Roles: the user is the Product Owner; Claude Code acts as Scrum Master and developers, and never validates on the Product Owner's behalf.

Consequences ​

  • The plan is versioned with the code; a commit can close a story and its code together.
  • No burndown chart, board view nor velocity; status is read from the files (a generated summary can be added later).
  • Moving to a tool later stays possible: the files map one-to-one to work items.

References ​

REF-SCRUM-GUIDE, REF-SAFE-STORY, REF-HUMANIZING-SPLITTING, backlog method